Information for record number MWA1639:
Holy Trinity Church, Long Itchington

Summary Holy Trinity Church originating in the 1100's. Alterations were made to the building in subsequent years, with the best work being carried out in the 1400's. The Church is situated in Church Road, Long Itchington.
What Is It?  
Type: Church, Building
Period: Medieval - Modern (1066 AD - 2050 AD)
Where Is It?  
Parish: Long Itchington
District: Stratford on Avon, Warwickshire
Grid Reference: SP 41 65
(Data represented on this map shows the current selected record as a single point, this is for illustrative purposes only and does not represent an accurate or complete representation of archaeological sites or features)
Level of Protection National - Old SMR PrefRef (Grade: )
Listed Building (Grade: II*)
Sites & Monuments Record
Picture(s) attached

 
Description

 
Source Number  

1 Chancel, nave, S aisle, W tower, N porch, and a vestry. Early 13th century S aisle; chancel, nave and tower built in early 14th century, clearstorey added to nave in 15th century, when the nave arcade was rebuilt. Modern porch and vestry. Restored 1928. Of roughly-coursed limestone rubble with red sandstone dressings.
2 Plan.
3 Drawing of c 1820.
4 Mouldings of doorway in S aisle can hardly be later than 1190; W and S lancets a little later. The best work is of c1300 - chancel N and S windows, S aisle E window etc. Finely-carved tomb-recesses, sedilia, double piscina, Easter sepulchre and chancel arch. 14th century screen. W tower has the stump of a spire blown down in 1762.
5 Listed Building description.
6 OS card.
7 Church Guidebook.
8 Letter re proposed levelling work.
 
Sources

Source No: 1
Source Type: Bibliographic reference
Title: Victoria County History, vol 6, Warwickshire
Author/originator: Salzman L F (ed)
Date: 1951
Page Number:
Volume/Sheet: VI
   
Source No: 7
Source Type: Bibliographic reference
Title: Holy Trinity Church, Long Itchington
Author/originator: Payne A
Date: 1970
Page Number:
Volume/Sheet:
   
Source No: 4
Source Type: Bibliographic reference
Title: The Buildings of England: Warwickshire
Author/originator: Pevsner N and Wedgwood A
Date: 1966
Page Number:
Volume/Sheet: Warwicks
   
Source No: 3
Source Type: Bibliographic reference
Title: Victoria County History, vol 6, Warwickshire
Author/originator: Salzman L F (ed)
Date: 1951
Page Number:
Volume/Sheet: VI
   
Source No: 2
Source Type: Bibliographic reference
Title: Victoria County History, vol 6, Warwickshire
Author/originator: Salzman L F (ed)
Date: 1951
Page Number:
Volume/Sheet: VI
   
Source No: 5
Source Type: Bibliographic reference
Title: LBL
Author/originator: DoE
Date: 1955
Page Number: 27
Volume/Sheet: Southam Rural
   
Source No: 8
Source Type: Correspondence
Title: Holy Trinity Church, Long Itchington
Author/originator: Lamb R G
Date: 1976
Page Number:
Volume/Sheet:
   
Source No: 6
Source Type: Unpublished document
Title: OS Card, 15SE2
Author/originator: Ordnance Survey
Date: 1968
Page Number:
Volume/Sheet: 15SE2
   
Images:  
Holy Trinity Church, Leamington Spa
Copyright: Warwickshire County Council
Date: 1900s
Click here for larger image  
 
back to top

Glossary

 
Word or Phrase
Description  
designation Listed Building Buildings and structures, such as bridges, that are of architectural or historical importance are placed on a statutory list. These buildings are protected by planning and conservation acts that ensure that their special features of interest are considered before any alterations are made to them.

Depending on how important the buildings are they are classed as Grade I, Grade II* or Grade II. Grade I buildings are those of exceptional interest. Grade II* are particularly important buildings of more than special interest. Those listed as Grade II are those buildings that are regarded of special interest.
back
source LBL Listed Building List. Buildings and structures, such as bridges, that are of architectural or historical importance are placed on a list. Buildings placed on the list are protected through various planning and conservation acts which ensure that their special features of interest are considered before any alterations are made to them. The Listed Buildings List is compiled and maintained by English Heritage. It includes details of where the building is, when it was built, a description of its appearance, and any other special features. back
source OS Card Ordnance Survey Record Card. Before the 1970s the Ordnance Survey (OS) were responsible for recording archaeological monuments during mapping exercises. This helped the Ordnance Survey to decide which monuments to publish on maps. During these exercises the details of the monuments were written down on record cards. Copies of some of the cards are kept at the Warwickshire Sites and Monuments Record. The responsibility for recording archaeological monuments later passed to the Royal Commission on Ancient and Historic Monuments. back
period Modern The Modern Period, about 1915 AD to the present (the 20th and 21st centuries AD)

In recent years archaeologists have realised the importance of recording modern sites. They do this so that in the future people will be able to look at the remains to help them understand the events to which they are related.
more ->
back
period Medieval 1066 AD to 1539 AD (the 11th century AD to the 16th century AD)

The medieval period comes after the Saxon period and before the post medieval period.

The Medieval period begins in 1066 AD.
This was the year that the Normans, led by William the Conqueror (1066 – 1087), invaded England and defeated Harold Godwinson at the Battle of Hastings in East Sussex.
The Medieval period includes the first half of the Tudor period (1485 – 1603 AD), when the Tudor family reigned in England and eventually in Scotland too.

The end of the Medieval period is marked by Henry VIII’s (1509 – 1547) order for the Dissolution of the Monasteries in the years running up to 1539 AD. The whole of this period is sometimes called the Middle Ages.
more ->
back
period modern About 1915 AD to the present (the 20th and 21st centuries AD)

In recent years archaeologists have realised the importance of recording modern sites. They do this so that in the future people will be able to look at the remains to help them understand the events to which they are related.
more ->
back
monument BUILDING * A structure with a roof to provide shelter from the weather for occupants or contents. Use specific type where known. back
monument ARCH * A structure over an opening usually formed of wedge-shaped blocks of brick or stone held together by mutual pressure and supported at the sides; they can also be formed from moulded concrete/ cast metal. A component; use for free-standing structure only. back
monument TOWER * A tall building, either round, square or polygonal in plan, used for a variety of purposes, including defence, as a landmark, for the hanging of bells, industrial functions, etc. Use more specific type where known. back
monument CHURCH * A building used for public Christian worship. Use more specific type where known. back
monument ROAD * A way between different places, used by horses, travellers on foot and vehicles. back
monument VESTRY * A room or part of a church where the vestments, vessels and records are kept. back
monument PISCINA * A perforated stone basin usually built into the wall of a church on the south side of the altar. Used for carrying away the ablutions (wine and water used to rinse the chalice, and wash the priests hands after communion). back
monument TOMB * A grave or sepulchre including a monument. Use specific type where known. back

* Copyright of English Heritage (1999)

English Heritage National Monuments Record